Industries we serve
A new factory, a housing project, a unit under notice or a hospital renewing its authorisation: the work starts with one question. What does the law require of you, and what is the fastest honest route to meeting it?
Sectors
Manufacturing and process
Manufacturing and process industriesPharmaceuticals and chemicalsSugar, distilleries and food processingPaper and pulp millsThermal power plantsMining and quarryingSteel plants and foundriesCement plantsBuildings and campuses
Real estate, townships and campusesHospitals and healthcareHotels and hospitalityInfrastructure, logistics, power, education
Infrastructure and constructionWarehousing and logisticsPower, DG-intensive and data facilitiesEducational institutionsManufacturing and process industries
Typically needs
Pharmaceuticals and chemicals
Typically needs
Sugar, distilleries and food processing
Includes the Lucknow-belt agro units: rice mills, flour mills, dairies and cold storages, along with sugar mills and distilleries.
Typically needs
Paper and pulp mills
Typically needs
Thermal power plants
Typically needs
Mining and quarrying
Typically needs
Steel plants and foundries
Typically needs
Cement plants
Typically needs
Real estate, townships and campuses
Approvals in the order the project needs them
Before plan sanction and RERA registration
prior Environmental Clearance for building and construction projects (built-up area 20,000 sq m and above, appraised by State Environment Impact Assessment Authority (SEIAA) Uttar Pradesh) and provisional Fire NOC under the UP Fire Prevention & Fire Safety Act 2022.
Before construction starts
Consent to Establish from Uttar Pradesh Pollution Control Board (UPPCB), C&D waste plan, groundwater NOC if a borewell will be used for construction water.
During construction
dust and noise control, six-monthly EC compliance reports.
Before the occupancy or completion certificate
Sewage treatment plant (STP) commissioned with treated-water reuse for flushing and horticulture, rainwater-harvesting structures built, Consent to Operate, final Fire Safety Certificate, DG-set compliance.
After handover
bulk-waste-generator compliance under the SWM Rules 2016 for the society or facility manager, and rainwater-harvesting records.
Starting construction before the EC and CTE are in hand is a violation that attracts penalties and can stall the project; we sequence the applications so each is filed early enough for a decision before the milestone that needs it.
Typically needs
Hospitals and healthcare
Typically needs
Hotels and hospitality
Typically needs
Infrastructure and construction
Typically needs
Warehousing and logistics
Typically needs
Power, DG-intensive and data facilities
Typically needs
Educational institutions
Typically needs
The lists above are indicative.
Applicability depends on capacity, location, process and category under the Environmental Impact Assessment (EIA) Notification 2006 and the State Pollution Control Board (SPCB) consent category (Red, Orange, Green or White).
Ask us for a compliance register (a list of every permission, condition and return that applies to your unit) specific to your site.
Not sure which permission you need?
Send two things: where the site is and what has been received or is planned.