ETP, STP, ZLD and pollution-control engineering
Every effluent treatment plant (ETP), sewage treatment plant (STP) and zero liquid discharge (ZLD) design we deliver, for plants and buildings in Lucknow, across Uttar Pradesh and in NCR, is checked against the consent conditions it must meet, so the plant that is built is the plant described in the consent application.
C.1 Water and wastewater
STP for housing, hospitals and hotels · ETP · CPU (RO, UF, MBR) · ZLD systems · …
STP for housing, hospitals and hotels
ETP
CPU (RO, UF, MBR)
ZLD systems
Treated-wastewater recycle and reuse
Rainwater harvesting and groundwater recharge
O&M supervision
Services marked as delivered through associates or partners: EnvironIQ coordinates and remains your single point of contact; the partner holds the accreditation or licence.
C.2 Air and noise
Air pollution control · Noise control engineering · Construction dust mitigation
Air pollution control
Noise control engineering
Construction dust mitigation
For NCR sites:
- anti-smog guns
- sprinklers and PM sensors mandated by the Commission for Air Quality Management (CAQM)
C.3 Energy and fire
Bio-CNG / CBG · Fire-fighting systems
Bio-CNG / CBG
Fire-fighting systems
Design, BOQ and PMC per NBC 2016 Part 4, installed through licensed fire contractors.
Approval of the scheme and the final Fire Safety Certificate sit with our Safety & Fire practice (area D).
Common questions
Who installs the fire-fighting system you design?
EnvironIQ prepares the design and the bill of quantities and provides project-management consultancy per NBC 2016 Part 4.
Installation is carried out through licensed fire contractors, who hold the licence; we supervise the work against the design so the installed system matches the design submitted for the Fire Safety Certificate.
How do you size an STP for a housing project, and can the treated water be reused?
Sizing is based on the design population and occupancy pattern, with the technology (MBBR, SBR or MBR) chosen for the space, odour and location constraints of the site.
EC conditions for building projects normally require treated water to be reused for flushing and horticulture through dual plumbing, so the STP is designed with tertiary treatment and the reuse scheme from the start, and commissioned before the occupancy-certificate inspection.
Our ETP is not meeting consent norms. What do you do first?
We sample across each treatment stage and run a mass balance to find where the design or the operation breaks down.
That produces an adequacy report with the corrective options, costed, before any retrofit is proposed.
Retrofit design, vendor coordination and commissioning supervision follow only if they are needed.
Do you design ZLD systems?
Yes. We design zero-liquid-discharge trains built around high-recovery RO, multiple-effect evaporators, crystallisers and agitated thin-film dryers, and we review and troubleshoot systems that are already installed. Every design is checked against the consent conditions it must meet.
Can treated wastewater be reused on site?
In most plants a large share of it can. With tertiary polishing, treated water can go to cooling towers, process uses and horticulture through dual plumbing. We design the reuse scheme so that it supports the consent conditions and reduces fresh-water draw.
Situations we handle under this practice
Talk to us about a design or adequacy problem
Send the location, what the unit or project is, what has been received or is planned, and any date on it.
- +91 63869 49114
- environiq@gmail.com