Talk to a consultant+91 63869 49114
  1. Home
  2. Services
  3. Safety & Fire
Practice area D

Fire NOC, safety audits and Factories Act compliance

For factories, warehouses and buildings in Lucknow and across Uttar Pradesh, we run pre-inspection readiness checks that walk the site the way a Factories Inspector or Fire Officer will, and close the gaps before they are written up.

D.1 Audits and assessments

EHS legal compliance audits · Safety audits

EHS legal compliance audits

Legal register and statutory tracking; audit-readiness before regulator inspections.

Safety audits

Workplace (IS 14489), machine, construction and warehouse; hazard identification and risk assessment (HIRA); process safety.

Services marked as delivered through associates or partners: EnvironIQ coordinates and remains your single point of contact; the partner holds the accreditation or licence.

D.2 Fire

Fire risk assessment and Fire NOC

Fire risk assessment and Fire NOC

Fire no-objection certificate (NOC) for buildings runs in two stages under the UP Fire Prevention & Fire Safety Act 2022:

  • a provisional NOC on the fire-fighting scheme at building-plan stage
  • and the final Fire Safety Certificate after installation and inspection
  • before occupancy

We prepare both, for residential high-rise, commercial, industrial and institutional occupancies, along with third-party fire safety audits and drills.

Where the system is still to be designed, our Design, Engineering & Commissioning practice prepares the NBC 2016 Part 4 scheme and bill of quantities (area C).

D.3 Emergency and statutory

Emergency management · Factories Act services · Allied statutory licensing

Emergency management

On-site emergency plans (MSIHC Rule 13), safety reports, occupier's technical inputs to district off-site plans and business continuity planning.

Factories Act services

  • Factory licence and plan approvals before the Directorate of Factories, UP
  • statutory registers, returns and accident or disease notifications
  • Safety Officer applicability and Safety Committee constitution
  • exemption and permission applications
  • competent-person testing coordination for pressure vessels, lifting tackle, hoists and lifts and structural stability

Allied statutory licensing

Through recognised partners:

  • PESO (Petroleum, SMPV and Gas Cylinder Rules)
  • Boilers Act registration and annual certification
Practice area D

Common questions

Is a Fire NOC required for our building in Uttar Pradesh?

Fire safety certification in Uttar Pradesh runs under the UP Fire Prevention & Fire Safety Act 2022, and applicability depends on the occupancy classification, height and use of the building.

For new buildings it has two stages: a provisional NOC on the scheme, which building-plan sanction depends on, and the final Fire Safety Certificate after installation and inspection, which occupancy depends on.

We confirm applicability site by site, review the fire-fighting system against NBC 2016 Part 4, and prepare the documentation, inspection and drill for both stages.

What is covered in an IS 14489 safety audit?

IS 14489 is the Indian standard for occupational safety and health audits of a workplace.

Our audits cover the workplace, machines, construction activity and warehouses, with hazard identification and risk assessment and, where the process demands it, process safety.

The report lists the gaps against statutory requirements with owners and dates.

When is an on-site emergency plan mandatory?

An on-site emergency plan is required under Rule 13 of the Manufacture, Storage and Import of Hazardous Chemical Rules where hazardous chemicals are present at or above the threshold quantities set in the Rules.

We prepare the plan and the safety report, and provide the occupier's technical inputs to the district off-site emergency plan.

Do you handle PESO and Boilers licensing?

Yes, through recognised partners.

Licences under PESO (the Petroleum, SMPV and Gas Cylinder Rules) and registration and annual certification under the Boilers Act are delivered by partners who hold the necessary recognition.

EnvironIQ prepares the site and the documentation and coordinates the process end to end.

Start here

Talk to us about safety and fire compliance

Send the location, what the unit or project is, what has been received or is planned, and any date on it.

We reply within two working days. Your details are used only to answer this enquiry. Privacy policy.