Short, plain-language notes on rule changes, deadlines and checklists that affect industries in Uttar Pradesh and NCR.

  1. Consents

    CTO renewal checklist for UPPCB

    What to assemble before a Consent to Operate renewal is filed through Nivesh Mitra into the Uttar Pradesh Pollution Control Board (UPPCB) Online Consent Management and Monitoring System (OCMMS): the current consent and its conditions, monitoring records, the compliance status of every condition, and the category and validity period being applied for.

    What to do: Start the file well before expiry and check every condition against a record. A renewal filed before expiry is what the Board expects to see; a unit whose consent lapses before it applies is operating without consent.

    Ask us about this
  2. Groundwater

    Groundwater NOC telemetry: what the NOC expects you to install

    Groundwater no-objection certificates (NOCs) from UP Ground Water Department (UPGWD) in Uttar Pradesh and under the NOCAP portal of Central Ground Water Authority (CGWA) carry conditions on flow meters, piezometers with digital water-level recorders, calibration and records. The telemetry package and the compliance reports that keep the NOC valid are the first things we set up.

    What to do: Read the conditions on your NOC and list what is installed against each. Where a meter or recorder is missing or uncalibrated, fix that before the next compliance report is due.

    Ask us about this
  3. Waste and Extended Producer Responsibility (EPR)

    EPR annual returns: one calendar for plastic, e-waste, battery, tyre and used oil

    Each EPR stream has its own registration, portal and annual return. Before filing, reconcile registrations, procurement and sales data, recycler and processor certificates, and obligations carried forward into the next year.

    What to do: Put every stream's due date on one calendar and reconcile the certificates before the due date. A return filed with unmatched certificates draws a query; a late one draws a notice.

    Ask us about this
  4. C&D waste

    C&D Waste Management Rules 2025: what applies to builders now

    Portal registration, utilisation targets and recycled-material compliance apply to builders and demolition contractors. Register early, plan segregation and storage on site, and track utilisation from the first demolition so the first return is routine rather than a scramble.

    What to do: Register on the portal before demolition or excavation begins and keep weighbridge or challan records for every load. Set the recycled-material share you will use and record it from the first purchase order.

    Ask us about this

Want these by email when new notes are published? Write to environiq@gmail.com.

Start here

Not sure which permission you need?

Send two things: where the site is and what has been received or is planned.