Hazardous waste, bio-medical waste and EPR compliance

Waste rules change often and the returns are unforgiving. For generators, hospitals and brands in Lucknow, across Uttar Pradesh and beyond, we keep authorisations current, returns filed by their due dates and disposal channels documented, so an inspection finds the records in order.

B.1 Hazardous and bio-medical waste

Hazardous & Other Wastes Rules 2016 · Bio-medical waste authorisation (BMW Rules 2016)

Hazardous & Other Wastes Rules 2016

  • Authorisation, Form 4 annual return by 30 June for the preceding financial year, Form 10 manifests, labelling and 90-day storage compliance
  • waste characterisation and TCLP studies
  • hazardous-waste storage design
  • TSDF and CBWTF membership and authorised-channel disposal
  • Rule 9 utilisation approvals and cement-kiln co-processing

Bio-medical waste authorisation (BMW Rules 2016)

Application and grant, CBWTF agreement liaison, barcode tracking, Form IV annual report by 30 June, segregation audits and training.

Services marked as delivered through associates or partners: EnvironIQ coordinates and remains your single point of contact; the partner holds the accreditation or licence.

B.2 Solid and construction waste

Solid waste · C&D Waste Management Rules 2025 · Boiler ash and fly ash

Solid waste

Bulk-waste-generator compliance under the SWM Rules 2016, segregation plans, on-site organic processing (composter, biomethanation, MRF design) for campuses, hotels, hospitals and townships.

C&D Waste Management Rules 2025

Portal registration, utilisation targets and recycled-material compliance for builders and demolition contractors.

Boiler ash and fly ash

  • Boiler-ash and press-mud management for sugar and agro-processing units
  • Fly Ash Notification compliance and ash-utilisation plans for coal- and lignite-based thermal plants

B.3 Extended Producer Responsibility

EPR registrations, annual returns and compliance · Plastic packaging compliance

EPR registrations, annual returns and compliance

Plastic, e-waste (including solar PV modules), battery, tyre and used oil.

Plastic packaging compliance

Recycled-content obligations, marking and labelling, compostable-plastic certification support and single-use-plastic ban audits.
Practice area B

Common questions

Which returns does a hazardous-waste generator have to file?

Under the Hazardous and Other Wastes Rules 2016 a generator needs a valid authorisation, files the Form 4 annual return by 30 June for the preceding financial year, and raises a Form 10 manifest for every consignment sent to an authorised channel.

Waste may be stored on site for no more than 90 days, with labelling and storage that meet the Rules.

We keep the authorisation current and the records inspection-ready.

Does a hospital need a separate bio-medical waste authorisation?

Yes.

A healthcare facility that generates bio-medical waste needs an authorisation under the Bio-Medical Waste Management Rules 2016, in addition to any consent it holds.

It also needs an agreement with a Common Bio-medical Waste Treatment Facility, barcode tracking and a Form IV annual report filed by 30 June.

We handle the application, the CBWTF agreement, and the segregation audits and training that keep it valid.

Who has EPR obligations?

Producers, importers and brand owners of plastic packaging, electrical and electronic equipment (including solar PV modules), batteries, tyres and used oil each carry Extended Producer Responsibility obligations.

Each stream has its own registration, portal and annual return.

We register, reconcile the data and file the returns.

What does bulk-waste-generator compliance involve for a campus, hotel or housing project?

Bulk waste generators under the Solid Waste Management Rules 2016 must segregate waste at source and process wet waste on their own premises as far as possible.

We prepare the segregation plan and design the on-site organic processing that fits the site: composters, biomethanation or a materials recovery facility.

For a housing project the duty passes to the residents' association or facility manager after handover, so we hand over the plan and records with the building.

Start here

Talk to us about waste and EPR compliance

Send the location, what the unit or project is, what has been received or is planned, and any date on it.

We reply within two working days. Your details are used only to answer this enquiry. Privacy policy.