Techno-legal support for SPCB and CPCB matters
A show-cause notice or closure direction is a technical problem before it is a legal one. For units in Lucknow, across Uttar Pradesh and in NCR, we build the factual record, the corrective action plan and the evidence that lets your counsel argue from strength.
F.1 Advisory and litigation support
Techno-legal advisory · Litigation support · EC-violation exposure
Techno-legal advisory
Litigation support
EC-violation exposure
Services marked as delivered through associates or partners: EnvironIQ coordinates and remains your single point of contact; the partner holds the accreditation or licence.
F.2 Appeals and directions
Statutory appeals · Closure and utility-disconnection directions
Statutory appeals
- Appeals to the Appellate Authority under Water Act s.28 and Air Act s.31, which lie within 30 days of communication of the order
- EP Act penalty adjudication as a separate route
Closure and utility-disconnection directions
- Corrective works, verification monitoring and the compliance demonstration required for revocation of directions issued under s.33A of the Water Act, s.31A of the Air Act or s.5 of the EP Act
- restart only after the Board's revocation order
F.3 Insurance and representation
Public Liability Insurance Act 1991 · Representation before authorities
Public Liability Insurance Act 1991
Representation before authorities
How we deal with authorities
- Applications are filed in the occupier's name through the occupier's own portal accounts.
- We appear before officers only under a written letter of authorisation and only on the record.
- We do not file monitoring data we have not verified.
- We will tell you when a unit cannot meet its conditions without changing its process.
Common questions
Our unit has received a show-cause notice from the SPCB. Where do we start?
Start with the reply and the personal hearing.
We build the factual record, draft the technical reply, represent the unit at the hearing under your letter of authorisation and put a time-bound corrective action plan before the Board.
Where a closure direction is in force, we prepare the corrective works and the compliance demonstration on which the Board considers revocation, alongside your counsel.
Do you support appellate and CPCB proceedings?
We provide the technical side: affidavits, rebuttals to joint-committee reports, site-inspection management and expert-witness services. All pleadings and appearances are through partner law firms, working with your counsel.
Our unit has been closed by SPCB direction. What happens first?
An early site assessment and a factual chronology of what was found and why.
That becomes a corrective action plan with dates, costs and proof of completion, followed by verification monitoring and the compliance report on which the Board considers revocation, with personal-hearing representation alongside your counsel.
The unit restarts only after the Board's revocation order, with monitoring so the closure does not repeat.
What statutory appeals are available against an SPCB order?
An order of the State Pollution Control Board can be appealed to the Appellate Authority under section 28 of the Water Act or section 31 of the Air Act within 30 days of the order being communicated, so the technical grounds have to be ready fast.
Penalty adjudication under the Environment (Protection) Act is a separate route.
We prepare the technical grounds; the appeal itself is filed through partner law firms.
Do you arrange public liability insurance?
We advise on compliance with the Public Liability Insurance Act 1991 and on public liability cover. The policy itself is placed through IRDAI-registered brokers; we define the exposure and the cover the site needs.
Situations we handle under this practice
Talk to us about a notice, closure or CPCB matter
Send the location, what the unit or project is, what has been received or is planned, and any date on it.
- +91 63869 49114